Analisis Metode Pemasangan Joe Panel Pada Proyek Meistardt Batam

Putra, Veri Irawan (2020) Analisis Metode Pemasangan Joe Panel Pada Proyek Meistardt Batam. Project Report. Universitas Internasional Batam. (Submitted)

[img]
Preview
Text
k-1611011-abstract-en.pdf

Download (203kB) | Preview
[img]
Preview
Text
k-1611011-abstract-id.pdf

Download (204kB) | Preview
[img] Text
k-1611011-bibliography.pdf

Download (286B)
[img]
Preview
Text
k-1611011-chapter1.pdf

Download (613kB) | Preview
[img]
Preview
Text
k-1611011-chapter2.pdf

Download (601kB) | Preview
[img]
Preview
Text
k-1611011-chapter3.pdf

Download (1MB) | Preview
[img]
Preview
Text
k-1611011-chapter4.pdf

Download (1MB) | Preview
[img] Text
k-1611011-chapter5.pdf
Restricted to Repository staff only

Download (1MB) | Request a copy
[img] Text
k-1611011-chapter6.pdf
Restricted to Repository staff only

Download (318kB) | Request a copy
[img] Text
k-1611011-chapter7.pdf

Download (282B)
[img]
Preview
Text
k-1611011-cover-id.pdf

Download (33kB) | Preview

Abstract

Joe green panel adalah sisa-sisa dari bagian partisi yang tidak terpakai yang didaur ulang menjadi sebuah beton yang dinamakan joe green panel, dalam pembahasan kerja praktek ini joe green panel digunakan untuk dinding-dinding unit apartmen. Ada beberapa metode , seperti marking, handling, melepas ikatan bundle, transporting, memasukan joe stopper, memasang L-Bracket, campur joint bonding adhesive, memasang material MEP, patching sisi panel, pemberian joint bonding, pemberian joint crack shield. Pekerjaan proyek meistardt batam pada bangunan tower a5 menggunakan joe green panel. Pekerjan pembangunan proyek mempuyai sususan struktur yang tertata baik dan penjadwalan yang tepat. ********************************************************************** Joe green panel is the remnants of unused part of the partition which is recycled into a concrete called Joe Green Panel, in the discussion of this practical work Joe Green Panel is used for apartment unit walls. There are several methods, such as marking, handling, removing bundle ties, transporting, inserting joe stopper, installing L-Bracket, mixing joint bonding adhesive, installing MEP material, patching side panels, applying joint bonding, applying joint crack shield. The project work on the batist meistardt a5 tower using joe green panel. Project development workers have a well-structured structure and proper scheduling.

Item Type: Monograph (Project Report)
Additional Information: Similarity: 15
Uncontrolled Keywords: joe grenn panel, structur joint, building
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
T Technology > TH Building construction
Divisions: School of Civil Engineering and Planning > Civil Engineering
SWORD Depositor: Admin Repository Universitas Internasional Batam
Depositing User: Admin Repository Universitas Internasional Batam
Date Deposited: 30 Apr 2020 03:38
Last Modified: 30 Apr 2020 03:40
URI: http://repository.uib.ac.id/id/eprint/2623

Actions (login required)

View Item View Item