Analisa dan Pelaksanaan Balok Bangunan 2 Lantai pada Proyek Paragon Hill

Hendi, Hendi (2020) Analisa dan Pelaksanaan Balok Bangunan 2 Lantai pada Proyek Paragon Hill. Project Report. Universitas Internasional Batam. (Submitted)

[img]
Preview
Text
k-1611001-abstract-en.pdf

Download (755kB) | Preview
[img]
Preview
Text
k-1611001-abstract-id.pdf

Download (748kB) | Preview
[img] Text
k-1611001-bibliography.pdf

Download (286B)
[img]
Preview
Text
k-1611001-chapter1.pdf

Download (1MB) | Preview
[img]
Preview
Text
k-1611001-chapter2.pdf

Download (3MB) | Preview
[img]
Preview
Text
k-1611001-chapter3.pdf

Download (1MB) | Preview
[img]
Preview
Text
k-1611001-chapter4.pdf

Download (1MB) | Preview
[img] Text
k-1611001-chapter5.pdf
Restricted to Repository staff only

Download (2MB) | Request a copy
[img] Text
k-1611001-chapter6.pdf
Restricted to Repository staff only

Download (826kB) | Request a copy
[img] Text
k-1611001-chapter7.pdf

Download (282B)
[img]
Preview
Text
k-1611001-cover-id.pdf

Download (34kB) | Preview

Abstract

Kerja praktek memberikan penulis pengalaman yang penting dalam mengetahui teknik ataupun tata cara pelaksanaan pekerjaan proyek. Kerja praktek ini juga memberikan kesempatan bagi penulis untuk menganalisa dan membandingkan hasil hitungan penulis yang sesuai dengan standar SNI dengan gambar rencana proyek struktur balok pada Proyek Pembangunan Perumahan Paragon Hill sehingga perhitungan yang benar dan akurat sangat diperlukan untuk tidak terjadinya kegagalan struktur yang menyebabkan korban jiwa. Tahap pengumpulan data selama kerja praktek adalah menggunakan metode wawancara, observasi, instrumen dan deskriptif sehingga mendapatkan data – data yang benar dengan narasumber berupa pemimpin proyek, pengawas lapangan dan para pekerja lainnya. Informasi dari pengumpulan data dapat memberikan penulis mengenai tahap – tahap, tata cara maupun langkah – langkah dalam proses pelaksanaan proyek. Struktur balok bangunan 2 lantai yang dikerjakan di Proyek Pembangunan Perumahan Paragon Hill berdasarkan perhitungan yang telah dilaksanakan oleh penulis sesuai SNI 03-2847-2002 dapat disimpulkan bahwa balok yang dihitung kuat memikul beban yang terjadi pada balok yaitu beban struktur dan beban hidup. ********************************************************************** The implementation of this internship aims to provide experience for the author in knowledge of the methods of implementing works in project. This internship also provides an opportunity for the author to analyze and compare the results of the author's calculation in accordance with SNI standards with the site plan of the beam structure in the Paragon Hill Housing Development Project. Therefore, the calculation must be correct and detail to avoid the occurrence of structural failure that causes death. The data collection stage during the implementation of internship uses the methods of observation, interview, descriptive and instruments to get the right data from the project leaders, field supervisors and other workers. Information from data collection can provide the writer with the stages, procedures and steps implementation process of the project. Based on the calculation in accordance with SNI 03-2847-2002, the author concluded that the beam structure of the 2-storey building that was carried out in the Paragon Hill Housing Development Project can withstand the loads that occurs in the beam.

Item Type: Monograph (Project Report)
Additional Information: Similarity: 24
Uncontrolled Keywords: beam structure, analysis, project, SNI
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
T Technology > TH Building construction
Divisions: School of Civil Engineering and Planning > Civil Engineering
SWORD Depositor: Admin Repository Universitas Internasional Batam
Depositing User: Admin Repository Universitas Internasional Batam
Date Deposited: 30 Apr 2020 03:10
Last Modified: 30 Apr 2020 03:12
URI: http://repository.uib.ac.id/id/eprint/2606

Actions (login required)

View Item View Item