Perhitungan Struktur Plat Lantai pada Proyek Pembangunan Gedung C Yayasan Ulil Albab

Septadianti, Tri Mutia (2018) Perhitungan Struktur Plat Lantai pada Proyek Pembangunan Gedung C Yayasan Ulil Albab. Project Report. UNSPECIFIED. (Submitted)

[img]
Preview
Text
k-1511044-abstract-en.pdf

Download (1MB) | Preview
[img]
Preview
Text
k-1511044-abstract-id.pdf

Download (845kB) | Preview
[img] Text
k-1511044-bibliography.pdf

Download (286B)
[img]
Preview
Text
k-1511044-chapter1.pdf

Download (2MB) | Preview
[img]
Preview
Text
k-1511044-chapter2.pdf

Download (3MB) | Preview
[img]
Preview
Text
k-1511044-chapter3.pdf

Download (2MB) | Preview
[img]
Preview
Text
k-1511044-chapter4.pdf

Download (5MB) | Preview
[img] Text
k-1511044-chapter5.pdf
Restricted to Repository staff only

Download (3MB) | Request a copy
[img] Text
k-1511044-chapter6.pdf
Restricted to Repository staff only

Download (1MB) | Request a copy
[img] Text
k-1511044-chapter7.pdf

Download (282B)
[img]
Preview
Text
k-1511044-cover-id.pdf

Download (16kB) | Preview

Abstract

Kerja Praktek ini dilakukan dengan tujuan untuk mempelajari dan mengamati secara langsung dilapangan dengan ilmu teori yang didapat selama dibangku perkuliahan, disini penulis membahas topik perhitungan struktur plat lantai pada Proyek Pembangunan Sekolah Gedung C Yayasan Ulil Albab , Kerja Praktek ini dilakukan selama 3 bulan lamanya yang terhitung sejak tanggal 12 Maret 2018 sampai dengan 12 Juni 2018, metode yang penulis lakukan pada Kerja Praktek ini yaitu dengan menggunakan pengamatan secara langsung dilapangan kerja, observasi, studi literature, serta peraturan konstruksi yang berlaku di Indonesia. Kerja Praktek ini memberikan pengalaman kepada penulis mengenai sistem kerja dilapangan khususnya yaitu pada struktur plat lantai, hasil yang didapatkan dari pelaksanaan Kerja Praktek ini yaitu cara pelaksanaan pekerjaan, serta tahap-tahap dalam pembangunan gedung, dan metode perawatan struktur. Perhitungan struktur yang dilakukan oleh penulis yang menggunakan peraturan SNI 2847-2013, dengan demikian struktur plat lantai yang digunakan oleh pihak perencana pada pembangunan ini dapat disimpulkan bahwa jenis tulangan yang dipakai cukup kuat dalam menopang beban yang bekerja. Kata kunci : perhitungan, struktur, plat lantai. ********************************************************************** This practical work is carried out with the aim to study and observe directly in the field with theoretical knowledge gained during lectures, here the author discusses the topic of calculating the floor plate structure in the School Construction Project Building C Ulil Albab Foundation, this Job Training is carried out for 3 months which counted from March 12, 2018 to June 12, 2018, the method that the author did in this Job Training is to use direct observation in the field of work, observation, literature study, and construction regulations in force in Indonesia. This practical work provides the author with experience regarding the work system in particular, namely on the structure of the floor plate, the results obtained from the implementation of this Job Training are the way of carrying out the work, as well as the stages in building construction, and structural maintenance methods. Calculation of the structure carried out by the author who uses the regulations of SNI 2847-2013, thus the structure of the floor plate used by the planners in this development can be concluded that the type of reinforcement used is strong enough to support the workload. Based on the results of structural calculations carried out by the author referring to support the workload. Keywords: calculation, structure, plate floor.

Item Type: Monograph (Project Report)
Additional Information: Similarity: 24
Uncontrolled Keywords: calculation, structure, plate floor
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
T Technology > TH Building construction
Divisions: School of Civil Engineering and Planning > Civil Engineering
SWORD Depositor: Admin Repository Universitas Internasional Batam
Depositing User: Admin Repository Universitas Internasional Batam
Date Deposited: 29 Apr 2020 08:25
Last Modified: 29 Apr 2020 08:27
URI: http://repository.uib.ac.id/id/eprint/2533

Actions (login required)

View Item View Item