Tata Cara Pelaksanaan Bored Pile pada Proyek Citra Plaza Nagoya PT.Pratama Widya

Andre, Andre (2018) Tata Cara Pelaksanaan Bored Pile pada Proyek Citra Plaza Nagoya PT.Pratama Widya. Project Report. UNSPECIFIED. (Submitted)

[img]
Preview
Text
k-1511037-abstract-en.pdf

Download (651kB) | Preview
[img]
Preview
Text
k-1511037-abstract-id.pdf

Download (651kB) | Preview
[img] Text
k-1511037-bibliography.pdf

Download (286B)
[img]
Preview
Text
k-1511037-chapter1.pdf

Download (862kB) | Preview
[img]
Preview
Text
k-1511037-chapter2.pdf

Download (1MB) | Preview
[img]
Preview
Text
k-1511037-chapter3.pdf

Download (2MB) | Preview
[img]
Preview
Text
k-1511037-chapter4.pdf

Download (3MB) | Preview
[img] Text
k-1511037-chapter5.pdf
Restricted to Repository staff only

Download (2MB) | Request a copy
[img] Text
k-1511037-chapter6.pdf
Restricted to Repository staff only

Download (723kB) | Request a copy
[img] Text
k-1511037-chapter7.pdf

Download (282B)
[img]
Preview
Text
k-1511037-cover-id.pdf

Download (18kB) | Preview

Abstract

Dalam pelaksanaan kerja praktek, tujuan dari penulis adalah untuk mendapatkan pengalaman kerja di luar, komunikasi dengan rekan kerja, serta sebagai salah satu syarat bagi mahasiswa untuk mendapatkan gelar sarjana (S-1). Kondisi lapangan di proyek Citra Plaza Nagoya sekarang ini adalah berada pada tahap pondasi bangunan. Penyusunan laporan kerja praktek ini menggunakan data-data lapangan yang berhubungan dengan topik kerja praktek yaitu tata cara pelaksanaan bored pile pada proyek Citra Plaza Nagoya. Data-data tersebut diperoleh menggunakan metode obeservasi, metode wawancara, metode dokumentasi, dan metode instrumen. Setelah itu dilakukan analisis dengan keputusan menteri ketenagakerjaan republik Indonesia nomor 111 tahun 2015 untuk mengetahui bahwa tata cara pengerjaan pondasi tersebut sesuai dengan standar yang ada. Dalam analisis tersebut, tata cara pelaksanaan bored pile pada proyek Citra Plaza Nagoya terbukti telah memenuhi sebagian besar standar yang ada, namun perlu dilakukan perubahan lagi yaitu diadakan pengoperasian bucket cleaning sehingga lubang pengeboran dapat dibersihkan sebelum pengecoran. ********************************************************************** In carrying out work, assignments with colleagues, and also as a requirement for students to get a bachelor's degree (S-1). Field conditions at Citra Plaza Nagoya are currently in the building foundation stage. The preparation of this practical work report uses field data related to practical work topics, namely the procedure for implementing bored pile on the Citra Plaza Nagoya project. These collected data is obtained using the observation method, interview method, documentation method, and instrument method. After that, an analysis by the Minister of Manpower of the Republic of Indonesia number 111 of 2015 was carried out to find out that the procedures for the construction of the foundation are in accordance with the existing standards. In this analysis, the procedure for the implementation of bored pile on the Citra Plaza Nagoya project proved to have met most of the existing standards, but it was necessary to make changes again, namely the operation of the bucket cleaning so that the drilling holes could be cleaned before casting.

Item Type: Monograph (Project Report)
Additional Information: Similarity: 8
Uncontrolled Keywords: Bored pile, Bucket cleaning, Analysis
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
T Technology > TH Building construction
Divisions: School of Civil Engineering and Planning > Civil Engineering
SWORD Depositor: Admin Repository Universitas Internasional Batam
Depositing User: Admin Repository Universitas Internasional Batam
Date Deposited: 29 Apr 2020 07:59
Last Modified: 29 Apr 2020 08:00
URI: http://repository.uib.ac.id/id/eprint/2515

Actions (login required)

View Item View Item