Kurniawan, Annur (2018) Proyek Pembangunan Gedung Apartemen "Formosa Residence". Project Report. UNSPECIFIED. (Submitted)
|
Text
k-1511011-abstract-en.pdf Download (652kB) | Preview |
|
|
Text
k-1511011-abstract-id.pdf Download (683kB) | Preview |
|
Text
k-1511011-bibliography.pdf Download (286B) |
||
|
Text
k-1511011-chapter1.pdf Download (1MB) | Preview |
|
|
Text
k-1511011-chapter2.pdf Download (1MB) | Preview |
|
|
Text
k-1511011-chapter3.pdf Download (2MB) | Preview |
|
|
Text
k-1511011-chapter4.pdf Download (8MB) | Preview |
|
Text
k-1511011-chapter5.pdf Restricted to Repository staff only Download (1MB) | Request a copy |
||
Text
k-1511011-chapter6.pdf Restricted to Repository staff only Download (719kB) | Request a copy |
||
Text
k-1511011-chapter7.pdf Download (282B) |
||
|
Text
k-1511011-cover-id.pdf Download (675kB) | Preview |
Abstract
Kerja praktek ini bertujuan untuk mengetahui proses pelaksanaan sebuah proyek pembangunan gedung bertingkat, yang dalam hal ini adalah pemeriksaan quality controling (mutu), metode Kesehatan dan Keselamatan Kerja (K3) tiap pekerjaan proyek, proses scheduling pekerjaan proyrk, pemantauan dan pengawasan terhadap manpower/pekerja, pengaturan pengeluaran kegaitan proyek, metode pelaksanaan pekerjaan-pekerjaan di lapangan, pengelolaan bahan, material serta peralatan dan proses inspeksi/commisioning/handover. Kegiatan kerja praktek yang dilaksanakan pada Proyek Pembangunan Gedung Apartementt “Formosa Residence” akan menjadi sumber data laporan penelitian pada penulisan laporan kerja praktek ini. Metode-metode yang digunakan dalam pelaksanaan kerja praktek ini adalah pengamatan (observasi), wawancara/interview, tinjauan pustaka, dan instrumen (dokumentasi). Kegiatan kerja praktek dilaksanakan sejak 01 Maret 2018 s.d. 01 Juni 2018 dianggap sebagai waktu yang cukup untuk mempelajari proses pelaksanaan sebuah proyek. Teknik pengumpulan data dilakukan dengan cara mengamati proses pekerjaan lapangan proyek tersebut. Hasil yang didapatkan dari kegiatan kerja praktek ini adalah memberikan manfaat manfaat yang lebih banyak bagi pribadi penulis baik itu ilmu pengetahuan, pengalaman lapangan serta ilmu pengetahuan tentang ilmu lapangan dan proses manajemen konstruksi sebuah proyek. selama kerja praktek penulis mampu memahami maupun mengertimetode-metode bagaimana cara penerapan ilmu dari teori yang dipelajari dibangku perkuliahan kepada kegiatan dilapangan. ********************************************************************** This practical work aims to determine the process of implementing a multi-stories building project, which in this case is the quality inspection, implementation of occupational health and safety, project scheduling, calculation and supervision of manpower / workers, project financing, methods field implementation, equipment management and inspection / commissioning / handover processes. Practical work activities carried out on the Apartment Building Project "Formosa Residence" will be a source of research data on the writing of this practical work report. The method used in the implementation of this practical work are observation on working progress, interview, literature review, and instrument (documentation). Practical work activities are carried out during the period 01 March 2018 until 01 June 2018 is considered enough time to study the process of implementing a project. Data collection techniques are carried out by observing the project fieldwork process. The results obtained from this practical work activity are that they can actually be made as much as possible in the past, how ever you can and continue to use as much as you can. After they have been released, they can be as much as you can from the next day of my meal.
Item Type: | Monograph (Project Report) |
---|---|
Additional Information: | Similarity: 21 |
Uncontrolled Keywords: | Report, practical work, construction, structure, multilevel building |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) T Technology > TH Building construction |
Divisions: | School of Civil Engineering and Planning > Civil Engineering |
SWORD Depositor: | Admin Repository Universitas Internasional Batam |
Depositing User: | Admin Repository Universitas Internasional Batam |
Date Deposited: | 29 Apr 2020 07:56 |
Last Modified: | 29 Apr 2020 07:57 |
URI: | http://repository.uib.ac.id/id/eprint/2512 |
Actions (login required)
View Item |