Perhitungan Struktur Kolom Pada Gedug C Yayasan Ulil Albab

Victoria, Liesca Monica (2018) Perhitungan Struktur Kolom Pada Gedug C Yayasan Ulil Albab. UNSPECIFIED. UNSPECIFIED. (Submitted)

[img]
Preview
Text
k-1511006-abstract-en.pdf

Download (992kB) | Preview
[img]
Preview
Text
k-1511006-abstract-id.pdf

Download (992kB) | Preview
[img] Text
k-1511006-bibliography.pdf

Download (286B)
[img]
Preview
Text
k-1511006-chapter1.pdf

Download (3MB) | Preview
[img]
Preview
Text
k-1511006-chapter2.pdf

Download (4MB) | Preview
[img]
Preview
Text
k-1511006-chapter3.pdf

Download (4MB) | Preview
[img] Text
k-1511006-chapter4.pdf
Restricted to Repository staff only

Download (5MB) | Request a copy
[img] Text
k-1511006-chapter5.pdf
Restricted to Repository staff only

Download (3MB) | Request a copy
[img]
Preview
Text
k-1511006-cover-id.pdf

Download (34kB) | Preview
[img]
Preview
Text
K_1511006_chapter6.pdf

Download (1MB) | Preview

Abstract

Tujuan dari kerja praktek untuk pembelajari perhitungan struktur kolom di lapangan pada proyek Pembangunan Gedung C Yayasan Ulil Albab Batam dalam memberikan beban yang dihasilakan dari beban konstruksi pada bangunan tersebut. Kegiatan ini dilaksanakan pada tanggal 12 April 2018 s.d. 12 Juni 2018s. Sistem yang dapat digunakan pada pelaksanaan Kerja Praktek ini adalah penelitian, wawancara, dan penyusunan dokumen. Dalam pelaksanaan ini memberikan pengalaman serta ilmu kepada penulis mengenai sistem dan metode pelaksanaan pekerjaan konstruksi dilapangan. Hal yang didapatkan dari pelaksanaan Kerja Praktek ini, adalah tata cara pelaksanaan pekerjaan, langkah-langkah pembangunan struktur, hingga metode perawatan dalam memperbaiki struktur. Berdasarkan perhitungan pada kolom yang dilaksanakan oleh penulis bahwa struktur kolom dengan 4 lantai meliputi proses pekerjaan struktur kolom bahwa beban yang akan diterima akan menahan beban struktur serta beban hidup pada gedung C saat beraktivitas. ********************************************************************** Job Training is the goal for learners to calculate column structure in the field in Building C Project of the Ulil Albab Batam Foundation in providing the resulting burden of the construction load on the building. This activity was held on April 12, 2018 June 12 2018s. The system that can be used in the implementation of this Practice Work is research, interviews, and preparation of documents. Job Training can provide the author with experience and knowledge regarding the system and method of carrying out construction work in the field. The things obtained from the implementation of this Job Training are the procedures for the implementation of work, the steps of building the structure, and the methods of treatment in improving the structure. Based on the calculation in the column carried out by the author that the column structure with 4 (four) floors includes the process of column structure work that the load that will be received will withstand the structural load and life load in building C when on the move.

Item Type: Monograph (UNSPECIFIED)
Additional Information: Similarity: 22%
Uncontrolled Keywords: calculation, development, school, column structure, civil engineering
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
T Technology > TH Building construction
Divisions: School of Civil Engineering and Planning > Civil Engineering
SWORD Depositor: Admin Repository Universitas Internasional Batam
Depositing User: Admin Repository Universitas Internasional Batam
Date Deposited: 29 Apr 2020 06:40
Last Modified: 29 Apr 2020 06:57
URI: http://repository.uib.ac.id/id/eprint/2469

Actions (login required)

View Item View Item