Analisa Metode Pelaksanaan Pekerjaan dan Menghitung Volume Cut and Fill di Proyek Pembangunan TPA Kota Batam

Wijaya, Indra (2018) Analisa Metode Pelaksanaan Pekerjaan dan Menghitung Volume Cut and Fill di Proyek Pembangunan TPA Kota Batam. Undergraduate thesis, Universitas Internasional Batam.

[img]
Preview
Text
k-1511002-abstract-en.pdf

Download (619kB) | Preview
[img]
Preview
Text
k-1511002-abstract-id.pdf

Download (620kB) | Preview
[img] Text
k-1511002-bibliography.pdf

Download (286B)
[img]
Preview
Text
k-1511002-chapter1.pdf

Download (570kB) | Preview
[img]
Preview
Text
k-1511002-chapter2.pdf

Download (734kB) | Preview
[img] Text
k-1511002-chapter3.pdf
Restricted to Repository staff only

Download (828kB) | Request a copy
[img] Text
k-1511002-chapter4.pdf
Restricted to Repository staff only

Download (1MB) | Request a copy
[img]
Preview
Text
k-1511002-chapter5.pdf

Download (1MB) | Preview
[img]
Preview
Text
k-1511002-cover-id.pdf

Download (12kB) | Preview

Abstract

Kerja praktek bertujuan agar mahasiswa menetahui sistem dan metode pelaksanaan di lapangan pekerjaan. Kegiatan ini juga dilaksanaakan sebagai salah satu bentuk aktualisasi dalam sebuah pengerjaan proyek. Kerja praktek meruapakah sebuah mata kuliah yang harus dilaksanakan dan merupakan salah satu syarat untuk kelulusan Program Studi Sarjana. Pembangunan TPA Kota Batam dikerjakan guna sebagai tempat pembuangan air yang dapat menampung sampah 5 tahun kedepan. Sehingga kerja praktek ini bertujuan agar dapat merekayasa dan menganalisa metode pengerjaan di proyek. Berdasarkan analisa dan perhitungan yang dilaksanakan oleh penulis yaitu perhitungan volume cut and fill di pembangunan TPA Kota Batam. ********************************************************************** Practical work aims for students to know the system and method of implementation in the work field. This activity was also carried out as a form of actualization in a project work. Practical work is a subject that must be implemented and is one of the requirements for graduating from a Bachelor's Degree Program. The construction of Batam City Landfill is carried out in order to serve as a water disposal facility that can accommodate waste in the next 5 years. So that this practical work aims to be able to engineer and analyze work methods in the project. Based on the analysis and calculations carried out by the author, the calculation of cut and fill volume in the construction of the Batam City Landfill.

Item Type: Thesis (Undergraduate)
Additional Information: Similarity: 24
Uncontrolled Keywords: TPA, excavate, waste
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
T Technology > TH Building construction
Divisions: School of Civil Engineering and Planning > Civil Engineering
SWORD Depositor: Admin Repository Universitas Internasional Batam
Depositing User: Admin Repository Universitas Internasional Batam
Date Deposited: 29 Apr 2020 06:19
Last Modified: 29 Apr 2020 06:20
URI: http://repository.uib.ac.id/id/eprint/2467

Actions (login required)

View Item View Item