Cayadi, Sutrisno (2018) Analisis Daya Dukung Struktur Kolom Beton Bertulang pada Proyek Pembangunan Gedung Bertingkat Grand Mall Batam. UNSPECIFIED. UNSPECIFIED. (Submitted)
|
Text
k-1511004-abstract-en.pdf Download (524kB) | Preview |
|
|
Text
k-1511004-abstract-id.pdf Download (524kB) | Preview |
|
Text
k-1511004-bibliography.pdf Download (286B) |
||
|
Text
k-1511004-chapter1.pdf Download (863kB) | Preview |
|
|
Text
k-1511004-chapter2.pdf Download (1MB) | Preview |
|
Text
k-1511004-chapter3.pdf Restricted to Repository staff only Download (1MB) | Request a copy |
||
Text
k-1511004-chapter4.pdf Restricted to Repository staff only Download (4MB) | Request a copy |
||
|
Text
k-1511004-chapter5.pdf Download (3MB) | Preview |
|
|
Text
k-1511004-cover-id.pdf Download (550kB) | Preview |
Abstract
Dalam laporan Kerja Praktek ini berisikan tujuan untuk menganalisa daya dukung yang dapat dibebankan pada struktur kolom gedung Grand Mall Batam. Pelaksanaan Kerja Praktek berjalan sejak periode bulan Februari sampai dengan bulan April 2018 selama 3 (tiga) bulan. Beberapa metode yang diimplementasikan dalam rangka pelaksanaan Kerja Praktek ini dimulai dari observasi lapangan dan wawancara langsung dengan pelaksana dan pemilik proyek. Di dalam Kerja Praktek ini telah memberikan banyak ilmu mengenai sistem serta metode pelaksanaan pekerjaan lapangan pada proyek. Ada juga luaran yang didapatkan yaitu tata cara pelaksanaan pekerjaan, tahap-tahap dan langkah-langkah pembangunan struktur. Berdasarkan perhitungan serta analisa struktur yang dilaksanakan oleh penulis, berdasarkan peraturan SNI T-15 1991-03, struktur kolom yang dirancang oleh pihak perencanaan dapat memiliki daya dukung untuk menopang beban struktur dan beban hidup yang akan terjadi pada saat gedung sedang beroperasional. ********************************************************************** This on-the-Job Training Report explained the purpose to analyze bearing capacity of reinforced concrete column structure at Grand Mall Batam. On-the-Job Training runs from February till April 2018 for 3 (three) months. Several methods are implemented during on-the-Job Training starts from field observation and direct interviews with project executors and project owners. This on-the-Job Training has provided me a lot of on-hand knowledge and experience in terms of construction management and methodology. The outcomes gained from this experiences are the operating procedure and construction stages. Based on calculation and structure analysis conducted by the authors, on accordance to regulation of SNI T-15 1991-03, designed column structure by the structure consultant shown is acceptable to bear structure’s dead load and live load.
Item Type: | Monograph (UNSPECIFIED) |
---|---|
Additional Information: | Similarity: 8 |
Uncontrolled Keywords: | analysis, reinforced concrete, bearing capacity, column structure |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) T Technology > TH Building construction |
Divisions: | School of Civil Engineering and Planning > Civil Engineering |
SWORD Depositor: | Admin Repository Universitas Internasional Batam |
Depositing User: | Admin Repository Universitas Internasional Batam |
Date Deposited: | 29 Apr 2020 05:00 |
Last Modified: | 29 Apr 2020 06:06 |
URI: | http://repository.uib.ac.id/id/eprint/2459 |
Actions (login required)
View Item |