Proyek Pembangunan Sporthall Kampus Universitas Internasional Batam

Fikri, Yan Heri (2018) Proyek Pembangunan Sporthall Kampus Universitas Internasional Batam. UNSPECIFIED. UNSPECIFIED. (Submitted)

[img] Text
k-1511045-abstract-en.pdf

Download (285B)
[img]
Preview
Text
k-1511045-abstract-id.pdf

Download (298kB) | Preview
[img] Text
k-1511045-bibliography.pdf

Download (286B)
[img]
Preview
Text
k-1511045-chapter1.pdf

Download (558kB) | Preview
[img]
Preview
Text
k-1511045-chapter2.pdf

Download (1MB) | Preview
[img] Text
k-1511045-chapter3.pdf
Restricted to Repository staff only

Download (1MB) | Request a copy
[img] Text
k-1511045-chapter4.pdf
Restricted to Repository staff only

Download (1MB) | Request a copy
[img]
Preview
Text
k-1511045-chapter5.pdf

Download (933kB) | Preview
[img]
Preview
Text
k-1511045-cover-id.pdf

Download (18kB) | Preview

Abstract

Kerja praktek ini bertujuan untuk menganalisis metode pelaksanaan dan kelayakan dan kemampuan baseplate yang diterapkan oleh PT. Anugerah Bintang trijaya dalam proses pembangunan Sporthall di area kampus Universitas Internasional Batam. Hasil dari penelitian dapat dijadikan sebagai informasi bagi perusahaan dan pengambilan keputusan yang lebih tepat dan akurat. Pelaksanaan kerja praktek meggunakan metode observasi, wawancara, dokumentasi, dan instrumen. Kerja Praktek ini memberikan pengeluaran meliputi analisa perhitungan daya tahan baseplate terhadap gaya-gaya serta mengecek kemampuan dari baseplate itu sendiri. Sistem ini di rancang mulai dari penentuan data-data proyek, pekerjaan persiapan, pekerjaan coating dan fabrikasi baja, proses tiang pancang. Hasil penelitian proyek menunjukkan bahwa kontruksi baseplate yang dianalisa dan diterapkan oleh PT.Anugerah Bintang Trijaya dalam proyek pembangunan Sporthall telah memenuhi persyaratan dari hasil penelitian kelayakan. ********************************************************************** This practical work aims to analyze the implementation method and the feasibility and capability of the baseplate applied by PT. Trijaya Star Award is in the process of building Sporthall in the Batam International University campus area. The results of the research can be used as information for the company and more accurate and accurate decision making. Implementation of practical work uses methods of observation, interviews, documentation, and instruments. Work This practice provides expenditure including an analysis of the calculation of baseplate resistance to styles and checking the ability of the baseplate itself. This system is designed starting from the determination of project data, preparatory work, steel coating and fabrication work, pile process. The results of the project research indicate that the construction of the baseplate is analyzed and applied by PT. Anugerah Bintang Trijaya in the Sporthall construction project has met the requirements of the results of the feasibility study.

Item Type: Monograph (UNSPECIFIED)
Additional Information: Similarity: 10
Uncontrolled Keywords: Baseplate, Construction, Steel, Analysis
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: School of Civil Engineering and Planning > Civil Engineering
SWORD Depositor: Admin Repository Universitas Internasional Batam
Depositing User: Admin Repository Universitas Internasional Batam
Date Deposited: 29 Apr 2020 04:52
Last Modified: 29 Apr 2020 04:53
URI: http://repository.uib.ac.id/id/eprint/2458

Actions (login required)

View Item View Item