Penerapan Building Information Modeling (bim) pada Proyek Pembangunan Kapal di Sekupang (studi Kasus : Proyek Pembangunan Workshop Kapal di Sekupang)

Ferry, Ferry (2020) Penerapan Building Information Modeling (bim) pada Proyek Pembangunan Kapal di Sekupang (studi Kasus : Proyek Pembangunan Workshop Kapal di Sekupang). Undergraduate thesis, Universitas Internasional Batam.

[img]
Preview
Text
s-1611014-abstract-en.pdf

Download (837kB) | Preview
[img]
Preview
Text
s-1611014-abstract-id.pdf

Download (838kB) | Preview
[img]
Preview
Text
s-1611014-bibliography.pdf

Download (1MB) | Preview
[img]
Preview
Text
s-1611014-chapter1.pdf

Download (871kB) | Preview
[img]
Preview
Text
s-1611014-chapter2.pdf

Download (1MB) | Preview
[img] Text
s-1611014-chapter3.pdf
Restricted to Repository staff only

Download (1MB) | Request a copy
[img] Text
s-1611014-chapter4.pdf
Restricted to Repository staff only

Download (753kB) | Request a copy
[img]
Preview
Text
s-1611014-chapter5.pdf

Download (864kB) | Preview
[img]
Preview
Text
s-1611014-cover-id.pdf

Download (18kB) | Preview

Abstract

Pembangunan bidang konstruksi yang semakin meningkat menuntut pihak pelaksana pembangunan untuk penyelesaian aktivitas proyek dengan lebih cepat dan efisien. Pada pelaksanaan proyek konstruksi umumnya banyak menghadapi permasalahn baik kegiatan dengan waktu, biaya maupun mutu. Mengaplikasikan BIM sampai pemodelan 4D dan menganalisi kinerja waktu pada proyek pembangunan workshop kapal merupakan tujuan dari penelitian ini. Software yang yang digunakan dalam proses pemodelan adalah Revit Structure, Navisworks. Pemodelan 3D diantaranya terdapat pondasi, kolom, balok, pelat dan atap. Menggabungkan jadwal atau schedule dengan model 3D akan menghasilkan pemodelan 4D didalam software Autodesk Navisworks. Analisis kinerja waktu yang dilakukan menggunakan metode kurva S. Penerapan BIM telah dilakukan hingga memperoleh model dalam bentuk 3D dan 4D. berdasarkan nilai devisasi, proyek ini tidak mengalami keterlambatan sama sekali. Nilai deviasi positif tertinggi +19.15% dan terendah +7.33%. Serta melakukan perhitungan anggaran biaya berdasarkan pemodelan di revit structure dengan total biaya Rp. 5.813.838.429. ********************************************************************** The development of the construction is increasing and demands constructors to complete their project activities as swiftly and efficiently as possible. In general, the implementation of construction is constantly met with obstacles that surround process, time, cost and also quality. The objective of the research is to apply Building Information Modeling (BIM) into the 4D model and to analyze the operation time in the shipbuilding workshop project. The software that is used in the modeling process is Revit Structure and Navisworks. 3D modeling includes foundations, columns, beams, plates, and roofs. Combining the design of the 3D model will result in 4D model in the Autodesk Navisworks software. The operation time will be analyzed by using the S Curve method. BIM has already been implemented and 3D and 4D models results were obtained. Based on the deviation value, the project is delay-free. The highest positive deviation is +19.15% and the lowest positive deviation is +7.33%. And calculate the cost budget based on modeling in the revit structure with a total cost of Rp. 5.813.838.429.

Item Type: Thesis (Undergraduate)
Additional Information: Similarity: 20
Uncontrolled Keywords: Building Information Modeling (BIM), operation time, S Curve, construction management, Revit Structure
Subjects: T Technology > TC Hydraulic engineering. Ocean engineering
Divisions: School of Civil Engineering and Planning > Civil Engineering
SWORD Depositor: Admin Repository Universitas Internasional Batam
Depositing User: Admin Repository Universitas Internasional Batam
Date Deposited: 28 Apr 2020 07:26
Last Modified: 28 Apr 2020 07:27
URI: http://repository.uib.ac.id/id/eprint/2340