Analisis Keterlambatan dan Penjadwalan Pekerjaan Struktur Gedung Mall (Studi Kasus: Mall Tower 5 Proyek Pollux Meisterstadt Batam)

Riyanto, Angghi (2019) Analisis Keterlambatan dan Penjadwalan Pekerjaan Struktur Gedung Mall (Studi Kasus: Mall Tower 5 Proyek Pollux Meisterstadt Batam). Undergraduate thesis, Universitas Internasional Batam.

[img]
Preview
Text
s-1511008-abstract-en.pdf

Download (122kB) | Preview
[img]
Preview
Text
s-1511008-abstract-id.pdf

Download (122kB) | Preview
[img]
Preview
Text
s-1511008-bibliography.pdf

Download (140kB) | Preview
[img]
Preview
Text
s-1511008-chapter1.pdf

Download (119kB) | Preview
[img]
Preview
Text
s-1511008-chapter2.pdf

Download (378kB) | Preview
[img]
Preview
Text
s-1511008-chapter5.pdf

Download (157kB) | Preview
[img]
Preview
Text
s-1511008-cover-id.pdf

Download (23kB) | Preview

Abstract

Skripsi merupakan syarat atau tugas akhir yang harus dilewati oleh mahasiswa untuk mencapai gelar sarjana. Pada kesempatan ini penulis membahas tentang analisis keterlambatan dan penjadwalan pekerjaan struktur gedung mall pada proyek Meisterstadt Batam. Ada beberapa metode yang digunakan dalam menyusun skripsi ini yaitu dengan menggunakan metode PERT, jalur kritis dan menggunakan diagram fish bone untuk menjelaskan tentang keterlambatannya. Berdasarkan hasil analisis dan pembahasan yang dilakukan dapat diketahui berapa biaya setelah mengalami keterlambatan dan mengetahui penjadwalan serta faktor apa saja yang menyebabkan keterlambatan pada pekerjaan struktur mall tower 5 pada proyek Meisterstadt Batam. Dari hasil Analisa yang telah dilakukan didapatkan biaya setelah pembekakan yaitu sebesar Rp. 1,849,477,668.12 dan memakan waktu perlambatan yaitu selama 28 hari dan faktor penyebab yang paling mempengaruhi keterlambatan yaitu faktor metode dan manusia. ********************************************************************** Thesis is a requirement or final assignment that must be passed by students to achieve a bachelor's degree. On this occasion the author discusses the analysis of delays and scheduling the structure of the mall building on the Batam Meisterstadt project. There are several methods used in preparing this thesis, namely using the PERT method, the critical path and using a fish bone diagram to explain the delay. Based on the results of the analysis and discussion, it can be seen how much the costs after experiencing delays and knowing the scheduling and what factors cause delays in tower 5 mall structure work on the Batam Meisterstadt project. From the results of the analysis that has been carried out, the cost after freezing is Rp. 1,849,477,668.12 and takes time to slow down for 28 days and the factors that most influence the delay are method and human factors.

Item Type: Thesis (Undergraduate)
Additional Information: Similarity: 14
Uncontrolled Keywords: Diagram Fish Bone, Jalur Kritis, PERT, Struktur Mall Tower 5
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
T Technology > TH Building construction
Divisions: School of Civil Engineering and Planning > Civil Engineering
SWORD Depositor: Admin Repository Universitas Internasional Batam
Depositing User: Admin Repository Universitas Internasional Batam
Date Deposited: 16 Oct 2019 07:28
Last Modified: 16 Oct 2019 07:28
URI: http://repository.uib.ac.id/id/eprint/1481

Actions (login required)

View Item View Item