Yunita, Yunita (2018) Analisis Perencanaan Plumbing Air Bersih dan Drainase pada Proyek Pembangunan Grand Mall Batam. Project Report. UNSPECIFIED. (Submitted)
|
Text
k-1511005-abstract-en.pdf Download (584kB) | Preview |
|
|
Text
k-1511005-abstract-id.pdf Download (445kB) | Preview |
|
Text
k-1511005-bibliography.pdf Download (286B) |
||
|
Text
k-1511005-chapter1.pdf Download (2MB) | Preview |
|
|
Text
k-1511005-chapter2.pdf Download (816kB) | Preview |
|
|
Text
k-1511005-chapter3.pdf Download (4MB) | Preview |
|
|
Text
k-1511005-chapter4.pdf Download (1MB) | Preview |
|
Text
k-1511005-chapter5.pdf Restricted to Repository staff only Download (1MB) | Request a copy |
||
Text
k-1511005-chapter6.pdf Restricted to Repository staff only Download (1MB) | Request a copy |
||
Text
k-1511005-chapter7.pdf Download (282B) |
||
|
Text
k-1511005-cover-id.pdf Download (23kB) | Preview |
Abstract
Sistem plumbing ialah bagian yang sangat penting yang tidak dapat dipisahkan dalam konstruksi pembangunan. Sistem plumbing penyedia air bersih pada gedung Grand Mall Batam meliputi sistem penyediaan air bersih, instalasi air bersih, analisa kebutuhan air bersih yang meliputi perkiraan jumlah pengunjung, jumlah penggunakan air bersih dalam sehari, perhitungan perencanaan dimensi pipa air bersih dari ground water tank ke roof tank dan mengetahui debit aliran pipa. Drainase ialah mengalihkan, membuang atau mengalirkan air. Secara umum diartikan sebagai serangkaian bangunan air yang bertujuan untuk dapat mengurangi kelebihan air dari sebuah kawasan. Metode yang digunakan untuk menghitung debit saluran adalah menggunakan rumus manning. Dari hasil analisa, penulis mendapatkan dimensi saluran dengan (h) = 0,9 m, B = 1 m, H = 0,6 m, Tebal Penutup Saluran = 0,1 m, dan L = 332 m. ********************************************************************** The plumbing system is a part that can not be separated in construction. Plumbing system of clean water providers in this building includes water supply system, clean water installation, clean water demand analysis covering the estimated number of visitors (occupants), the amount of clean water use in a day, the calculation of the dimension of clean water pipe from the ground water tank to the roof tanks and know the flow of pipes. Drainage is to divert, dispose or drain water. Generally defined as a series of water buildings that aim to reduce the excess water from a region. The method used to calculate the channel discharge is to use the manning formula. From result of analysis, writer get channel dimension with (h) = 0,9 m, B = 1 m, H = 0,6 m, Thickness of Channel Cover = 0,1 m, and L = 332 m.
Item Type: | Monograph (Project Report) |
---|---|
Additional Information: | Similarity: 23 |
Uncontrolled Keywords: | Analysis,pipe,plumbing,ditch,drainage |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) T Technology > TH Building construction |
Divisions: | School of Civil Engineering and Planning > Civil Engineering |
SWORD Depositor: | Admin Repository Universitas Internasional Batam |
Depositing User: | Admin Repository Universitas Internasional Batam |
Date Deposited: | 29 Apr 2020 07:22 |
Last Modified: | 29 Apr 2020 07:24 |
URI: | http://repository.uib.ac.id/id/eprint/2481 |
Actions (login required)
View Item |