Analisis Hasil PDA Test pada Pondasi Proyek Pembangunan Apartement Puri Khayangan Residence

Putri, Melia Kusuma (2018) Analisis Hasil PDA Test pada Pondasi Proyek Pembangunan Apartement Puri Khayangan Residence. Project Report. UNSPECIFIED. (Submitted)

[img]
Preview
Text
k-1511021-abstract-en.pdf

Download (845kB) | Preview
[img]
Preview
Text
k-1511021-abstract-id.pdf

Download (845kB) | Preview
[img] Text
k-1511021-bibliography.pdf

Download (286B)
[img]
Preview
Text
k-1511021-chapter1.pdf

Download (3MB) | Preview
[img]
Preview
Text
k-1511021-chapter2.pdf

Download (5MB) | Preview
[img]
Preview
Text
k-1511021-chapter3.pdf

Download (5MB) | Preview
[img]
Preview
Text
k-1511021-chapter4.pdf

Download (6MB) | Preview
[img] Text
k-1511021-chapter5.pdf
Restricted to Repository staff only

Download (5MB) | Request a copy
[img] Text
k-1511021-chapter6.pdf
Restricted to Repository staff only

Download (1MB) | Request a copy
[img] Text
k-1511021-chapter7.pdf

Download (282B)
[img]
Preview
Text
k-1511021-cover-id.pdf

Download (16kB) | Preview

Abstract

Kerja praktik lapangan memiliki tujuan yaitu untuk memberikan pengalaman kepada mahasiswa bagaimana lingkungan kerja yang sesungguhnya.Kerja praktik lapangan ini dilaksanakan di Proyek Pembangunan Apartement Puri Khayangan Residence. Kegiatan kerja praktik ini dilaksanakan selama 90 hari, dimulai pada tanggal 13 Februari 2018 sampai dengan 13 Mei 2018. Metode yang digunakan dalam mengumpulkan data untuk keperluan penulisan laporan ialah metode literatur, metode observasi, dan metode interview. Pada pembangunan proyek ini, pihak perencana melakukan uji tanah dengan metode SPT. Hasil yang didapat dari nilai SPT mendapatkan kesimpulan bahwa pondasi jenis bored pile yang cocok untuk dijadikan pondasi bangunan. Analisis perhitungan menggunakan data SPT menggunakan dua metode, yaitu metode L.Decourt dan Reese & Wright 1997.Hasil dari perhitungan tersebut mendapatkan bahwa daya dukung tiang pada BH 1 dan BH 2 memenuhi izin dengan penurunan maksimum sebesar 1,05cm. ********************************************************************** Field practical work has a purpose, namely to provide experience to students how the real working environment. Work was carried out on the practice field Apartment Development Project Puri Khayangan Residence. This practical work activities carried out for 90 days, starting on February 13, 2018 through May 13, 2018. The method used to collect data for the purpose of writing is to literature method, observation and interview methods. In the development of this project, the planners to test the soil with SPT method. The results obtained from the value of the SPT to the conclusion that the kind of bored pile foundation that is suitable to be used as building foundations. Analysis calculations using SPT data using two methods, the methods L.Decourt and Reese & Wright, 1997. The results of these calculations to get that pile bearing capacity at BH 1 and BH 2 meet permit with the maximum decrease of 1,05cm

Item Type: Monograph (Project Report)
Additional Information: Similarity: 21
Uncontrolled Keywords: carrying capacity of the land, such as the results, such as grades, test soil, a test pda.
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
T Technology > TH Building construction
Divisions: School of Civil Engineering and Planning > Civil Engineering
SWORD Depositor: Admin Repository Universitas Internasional Batam
Depositing User: Admin Repository Universitas Internasional Batam
Date Deposited: 29 Apr 2020 07:26
Last Modified: 29 Apr 2020 07:33
URI: http://repository.uib.ac.id/id/eprint/2484

Actions (login required)

View Item View Item