Up a level |
Umar, Usmanul Hayadi and Hendri, Hendri (2020) Analisa Tender Pekerjaan Interior Pada Proyek Marriott Hotel Untuk Mencari Harga Dan Mutu Yang Paling Efisien. Journal Civil Engineering and Planning, 10 (10). (Submitted)
Umar, Usmanul Hayadi and Sudarson, Willim (2020) EVALUASI PENJADWALAN PROYEK DENGAN METODE LINE OF BALANCE (LOB) (Studi Kasus: Hotel Santika Batam). Journal of Civil Engineering and Planning, 10 (10). (Submitted)
Umar, Usmanul Hayadi and Putra, Wico Mindra (2020) Estimasi Waktu untuk Pengadaan Material Berdasarkan Time Schedule pada Proyek Pembangunan Ruko Kawasan SP Plaza Batu Aji. Journal of Civil Engineering and Planning, 10 (10). (Submitted)
Umar, Usmanul Hayadi and Hutapea, Daniel Sabar Menanti (2020) PERENCANAAN STRUKTUR WHARF DENGAN KAPASITAS 20.000 DWT. Journal of Civil Engineering and Planning, 10 (10). (Submitted)
Umar, Usmanul Hayadi (2019) Analisis Kuat Tekan Beton dengan Serbuk Kayu Jati. Journal of Civil Engineering and Planning, 1 (1). pp. 20-25.
Umar, Usmanul Hayadi and Suwarno, Suwarno (2015) Sistem Informasi Penjadwalan Proyek Kontruksi Menggunakan Metode Fuzzy Logic. Computer and Information Sciences Journal, 9 (1). ISSN 1907-6460