Faldo, Fransisco (2018) Analisa dan Cara Membuat Kurva S Pada Proyek Pembangunan dan Pengembangan Dermaga Curah Kabil - Batam. Project Report. UNSPECIFIED. (Submitted)
|
Text
k-1511026-abstract-en.pdf Download (586kB) | Preview |
|
|
Text
k-1511026-abstract-id.pdf Download (971kB) | Preview |
|
Text
k-1511026-bibliography.pdf Download (286B) |
||
|
Text
k-1511026-chapter1.pdf Download (724kB) | Preview |
|
|
Text
k-1511026-chapter2.pdf Download (1MB) | Preview |
|
|
Text
k-1511026-chapter3.pdf Download (2MB) | Preview |
|
|
Text
k-1511026-chapter4.pdf Download (724kB) | Preview |
|
Text
k-1511026-chapter5.pdf Restricted to Repository staff only Download (1MB) | Request a copy |
||
Text
k-1511026-chapter6.pdf Restricted to Repository staff only Download (197kB) | Request a copy |
||
Text
k-1511026-chapter7.pdf Download (282B) |
||
|
Text
k-1511026-cover-id.pdf Download (64kB) | Preview |
Abstract
Dalam setiap pelaksanaan proyek konstruksi umumnya mempunyai rencana pelaksanaan dan jadwal pelaksanaan, kapan pelaksanaan kontruksi harus dimulai dan diselesaikan serta bagaimana proyek tersebut akan dilaksanakan maka sangat diperlukan perencanaan yang matang dan baik. Manajemen proyek merupakan salah satu cara untuk mengelola suatu proyek agar kegiatan pelaksanaan proyek dapat mencapai mutu,waktu dan biaya yang sudah direncanakan. Untuk mengontrol pelaksanaan proyek berjalan sesuai dengan rencana yang sudah ditentukan maka dapat menggunakan salah satu metode untuk menjaga keberlangsungan proyek tersebut yaitu dengan menggunakan kurva s. Kurva S merupakan peningkatan dan penggabungan dari diagram balok (bar chart) dan Hannum Curve, Sehingga pada Kurva S dapat digambarkan perkembangan volume pekerjaan yang diselesaikan selama proyek berlangsung. Pengelolaan dalam pelaksanaan pekerjaan proyek dapat dilakukan dengan cara membandingkan posisi Kurva S aktual dengan Kurva S rencana ********************************************************************** In every construction project implementation generally has an implementation plan and implementation schedule, when the construction must be started and completed and how the project will be carried out, it is very necessary to have a good and good planning. Project management is one way to manage a project so that project implementation activities can achieve the planned quality, time and cost. To control the implementation of the project running in accordance with a predetermined plan can use one method to maintain the continuity of the project by using the curve s. The S curve is an increase and a combination of bar charts and Hannum Curve, so that the s curve can describe the development of the volume of work completed during the project. Management in the implementation of project work can be done by comparing the position of the actual s curve with the plan s curve.
Item Type: | Monograph (Project Report) |
---|---|
Additional Information: | Similarity: 18% |
Uncontrolled Keywords: | Analysis, Curve S, Project Management |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) T Technology > TH Building construction |
Divisions: | School of Civil Engineering and Planning > Civil Engineering |
SWORD Depositor: | Admin Repository Universitas Internasional Batam |
Depositing User: | Admin Repository Universitas Internasional Batam |
Date Deposited: | 29 Apr 2020 07:42 |
Last Modified: | 29 Apr 2020 07:43 |
URI: | http://repository.uib.ac.id/id/eprint/2497 |
Actions (login required)
View Item |