Putri, Nabila Marta (2018) Analisis Perencanaan Pekerjaan Struktur Retaining Wall pada Proyek Pembangunan Masjid Agung Tanjung Uncang Kota Batam. Project Report. UNSPECIFIED. (Submitted)
|
Text
k-1511024-abstract-en.pdf Download (594kB) | Preview |
|
|
Text
k-1511024-abstract-id.pdf Download (595kB) | Preview |
|
Text
k-1511024-bibliography.pdf Download (286B) |
||
|
Text
k-1511024-chapter1.pdf Download (2MB) | Preview |
|
|
Text
k-1511024-chapter2.pdf Download (1MB) | Preview |
|
|
Text
k-1511024-chapter3.pdf Download (401kB) | Preview |
|
|
Text
k-1511024-chapter4.pdf Download (913kB) | Preview |
|
Text
k-1511024-chapter5.pdf Restricted to Repository staff only Download (300kB) | Request a copy |
||
Text
k-1511024-chapter6.pdf Restricted to Repository staff only Download (570kB) | Request a copy |
||
Text
k-1511024-chapter7.pdf Download (282B) |
||
|
Text
k-1511024-cover-id.pdf Download (17kB) | Preview |
Abstract
Kerja praktek yang dilaksanakan selama 3 bulan dimulai dari 19 pebruari 2018 sampai dengan 19 mei 2018,bertujuan untuk mengamati metode kerja dan menganalisa kekuatan struktur dinding penahan pada Proyek Pembangunan Pembangunan Masjid Agung Tanjung Uncang Kota Batam. Kerja praktek yang telah dilaksanakan ini memberikan pengalaman kepada penulis bagaimana ruang lingkup dan metode pekejaan konstruksi melalui pengamatan secara langsung ketika pekerjaan konstruksi sedang berlangsung. Dinding penahan merupakan salah satu pekerjaan struktur yang terdapat dalam pembagunan Masjid Agung Tanjung Uncang Kota Batam, untuk itu penulis menganalisi perhitungan dinding penahan tanah dan didapatkan hasil bahwa struktur yang direncanakan oeleh pihak perencana Pembangunan Masjid Agung Tanjung Uncang Kota Batam aman terhadap bahaya penggulingan dan penggeseran yang disebabkan oleh tekanan tanah lateral disekitar dinding penahan tanah. ********************************************************************** The purpose of intership program carried out for 3 months began from February 19th, 2018, to May 19th,2018, aimed at observing work methods and analyzing the strength of retaining wall structures in the Construction Project of the Great Mosque of Batam.The purpose of intership program that has been carried out gives the author experience how the scope and method of construction work through direct observation when construction work is in progress. Retaining wall is one of the structural work contained in the construction of the Great Mosque of Batam City, for this reason the author analyzes the calculation of retaining walls and results show that the planned structure by the planners of the Construction of the Great Mosque of Batam City is safe against the danger of rolling and sliding caused by soil pressure. lateral around the retaining wall.
Item Type: | Monograph (Project Report) |
---|---|
Additional Information: | Similarity: 21 |
Uncontrolled Keywords: | mosque, retaining wall structure, structural analysis |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) T Technology > TH Building construction |
Divisions: | School of Civil Engineering and Planning > Civil Engineering |
SWORD Depositor: | Admin Repository Universitas Internasional Batam |
Depositing User: | Admin Repository Universitas Internasional Batam |
Date Deposited: | 29 Apr 2020 07:34 |
Last Modified: | 29 Apr 2020 07:36 |
URI: | http://repository.uib.ac.id/id/eprint/2489 |
Actions (login required)
View Item |