Analisa Perhitungan Volume Besi dan Beton Pada Struktur Kolom Gedung Tower 1Proyek Meisterstadt Batam

Riyanto, Angghi (2018) Analisa Perhitungan Volume Besi dan Beton Pada Struktur Kolom Gedung Tower 1Proyek Meisterstadt Batam. UNSPECIFIED. UNSPECIFIED. (Submitted)

[img]
Preview
Text
k-1511008-abstract-en.pdf

Download (1MB) | Preview
[img]
Preview
Text
k-1511008-abstract-id.pdf

Download (1MB) | Preview
[img] Text
k-1511008-bibliography.pdf

Download (286B)
[img]
Preview
Text
k-1511008-chapter1.pdf

Download (2MB) | Preview
[img]
Preview
Text
k-1511008-chapter2.pdf

Download (5MB) | Preview
[img]
Preview
Text
k-1511008-chapter3.pdf

Download (2MB) | Preview
[img]
Preview
Text
k-1511008-chapter4.pdf

Download (7MB) | Preview
[img]
Preview
Text
k-1511008-chapter5.pdf

Download (2MB) | Preview
[img]
Preview
Text
k-1511008-chapter6.pdf

Download (1MB) | Preview
[img] Text
k-1511008-chapter7.pdf

Download (282B)
[img]
Preview
Text
k-1511008-cover-id.pdf

Download (18kB) | Preview

Abstract

Kerja praktek merupakan tujuan pembelajaran langsung di lapangan khususnya menghitung volume pembesian dan volume beton pada struktur kolom gedung tower 1 proyek meisterstadt batam. Kegiatan kerja praktek telah dilaksanakan selama 3 bulan. Ada beberapa metode yang digunakan pada saat kerja praktek yaitu interview, observasi, simulasi dan perancangan. Pada proyek ini akan dapat memberikan pengalaman yang besar dan mengetahui kondisi dilapangan. Dimulai dari awal pembangunan sampai metode perawatan yang dilakukan untuk gedung yang akan di bangun. Berdasarkan hasil perhitungan volume pembesian dan volume beton pada struktur kolom gedung tower 1 dapat diketahui berapa jumlah dan berat material yang akan dipakai. ********************************************************************** Practical work is hands-on learning objectives in the field, especially pembesian calculate volume and volume of concrete in the structure of the tower building column 1 project meisterstadt Batam. Practical work has been carried out for 3 months. The method can be used in the implementation of practical work are observation, interviews, design and simulation. Practical work on this project can provide a great experience and determine the condition of the field. Starting from the beginning of construction to methods of treatment done to the building that will be built. Based on calculations pembesian volume and volume of concrete in the structure of the tower building column 1 it can be seen how the number and weight of the material to be used.

Item Type: Monograph (UNSPECIFIED)
Additional Information: Similarity: 24%
Uncontrolled Keywords: calculation, construction of tower buildings, structural columns, civil engineering.
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
T Technology > TH Building construction
Divisions: School of Civil Engineering and Planning > Civil Engineering
SWORD Depositor: Admin Repository Universitas Internasional Batam
Depositing User: Admin Repository Universitas Internasional Batam
Date Deposited: 29 Apr 2020 07:01
Last Modified: 29 Apr 2020 07:03
URI: http://repository.uib.ac.id/id/eprint/2473

Actions (login required)

View Item View Item