Putra, Wico Mindra (2020) Estimasi Waktu untuk Pengadaan Material Berdasarkan Time Schedule pada Proyek Pembangunan Ruko Kawasan SP Plaza Batu Aji. Undergraduate thesis, Universitas Internasional Batam.
|
Text
s-1611028-abstract-en.pdf Download (759kB) | Preview |
|
|
Text
s-1611028-abstract-id.pdf Download (760kB) | Preview |
|
|
Text
s-1611028-bibliography.pdf Download (757kB) | Preview |
|
|
Text
s-1611028-chapter1.pdf Download (769kB) | Preview |
|
|
Text
s-1611028-chapter2.pdf Download (845kB) | Preview |
|
Text
s-1611028-chapter3.pdf Restricted to Repository staff only Download (763kB) | Request a copy |
||
Text
s-1611028-chapter4.pdf Restricted to Repository staff only Download (1MB) | Request a copy |
||
|
Text
s-1611028-chapter5.pdf Download (762kB) | Preview |
|
|
Text
s-1611028-cover-id.pdf Download (13kB) | Preview |
Abstract
Penelitian ini bertujuan untuk mengestimasi waktu untuk pengadaan material berdasarkan time schedule pada proyek pembangunan ruko Kawasan SP Plaza Batu Aji. Metode yang digunakan dalam penentuan estimasi waktu adalah dengan metode konvensional dimana proses penjadwalan dibuat dalam bentuk barchart agar lebih mudah dipahami oleh pembaca dan juga menjadikan penjadwalan lebih tertata dan sistematis. Hasil estimasi pengadaan material hingga sampai dilokasi proyek adalah 15 hari dan rata-rata pengadaan riil lapangan adalah 12 hari, Sehingga dapat disimpulkan bahwa proses pengadaan material pada pembangunan Ruko Kawasan SP Plaza tidak terjadi keterlambatan material untuk pekerjaan struktur, pekerjaan dinding dan pekerjaan atap. ********************************************************************** The research aims to estimate the time for material procurement based on time schedule in Batu Aji SP Plaza Area. The method used in the determining the estimated time is conventional method in which the scheduling process is made in the form of a barchart to be more easily understood by readers and also makes scheduling more orderly and systematic. The estimated results of material procurement until arrived the project location is 15 days and the average real field procurement is 12 days, so it can be concluded that the material procurement process in the construction of Ruko Kawasan SP Plaza does not occure material delays for structural work, wall work and roof work.
Item Type: | Thesis (Undergraduate) |
---|---|
Additional Information: | Similarity: 14 |
Uncontrolled Keywords: | Time Schedule, Conventional, Material |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | School of Civil Engineering and Planning > Civil Engineering |
SWORD Depositor: | Admin Repository Universitas Internasional Batam |
Depositing User: | Admin Repository Universitas Internasional Batam |
Date Deposited: | 28 Apr 2020 08:13 |
Last Modified: | 28 Apr 2020 08:14 |
URI: | http://repository.uib.ac.id/id/eprint/2378 |
Actions (login required)
View Item |