Augustone, Nelson (2020) Potensi Perencanaan Aliran Air Bendungan Sei Gong Sebagai Sumber Energi Terbarukan Melalui Pltmh. Undergraduate thesis, Universitas Internasional Batam.
|
Text
s-1611048-abstract-en.pdf Download (721kB) | Preview |
|
|
Text
s-1611048-abstract-id.pdf Download (717kB) | Preview |
|
|
Text
s-1611048-bibliography.pdf Download (724kB) | Preview |
|
|
Text
s-1611048-chapter1.pdf Download (715kB) | Preview |
|
|
Text
s-1611048-chapter2.pdf Download (1MB) | Preview |
|
Text
s-1611048-chapter3.pdf Restricted to Repository staff only Download (812kB) | Request a copy |
||
Text
s-1611048-chapter4.pdf Restricted to Repository staff only Download (969kB) | Request a copy |
||
|
Text
s-1611048-chapter5.pdf Download (728kB) | Preview |
|
|
Text
s-1611048-cover-id.pdf Download (43kB) | Preview |
Abstract
Penggunaan energi yang berasal dari minyak bumi atau fosil memberikan dampak terhadap lingkungan yang kurang baik dan semakin lama jumlahnya juga semakin sedikit. Oleh karena itu, adanya keperluan untuk mencari energi yang dapat memiliki siklus atau terbarukan yang bersifat alami dan tidak merusak lingkungan. Salah satu bentuk energi terbarukan yang berkelanjutan dan memiliki siklus adalah air. Perhitungan pada perencanaan ini bertujuan untuk mengetahui potensi aliran air pada Bendungan Sei Gong sebagai salah satu sumber energi terbarukan melalui Pembangkit Listrik Tenaga Mikro Hidro (PLTMH). Perhitungan pada perencanaan ini terdiri atas perhitungan analisa hidrologi, analisa debit andalan, perhitungan daya listrik yang mampu dihasilkan, dan pemilihan jenis turbin yang cocok. Perhitungan analisa hidrologi menggunakan data klimatologi dari stasiun BMKG. Sedangkan untuk perhitungan debit andalan memerlukan data Bendungan Sei Gong. Hasil daripada perhitungan dalam perencanaan ini mendapatkan hasil curah hujan rencana maksimum 100 tahun adalah 442,163 mm, debit banjir rencana 100 tahun adalah 441,984 m3/detik, dan perhitungan debit andalan 0,11 m3/detik. Dengan hasil hidrologi demikian, maka daya listrik yang dapat dihasilkan adalah 3,24 kW. Sehingga dapat disimpulkan bahwa Bendungan Sei Gong berpotensi sebagai PLTMH namun dengan daya listrik yang dihasilkan sangata kecil. Dengan tinggi jatuh air 6 meter, maka jenis turbin yang digunakan adalah jenis turbin Kaplan & Propeller. ********************************************************************** The use of energy derived from petroleum or fossils has a negative impact on the environment and also the longer the amount is also less. Therefore, it is necessary to look for energy that have a cycle or can be renewable that is natural and does not damage the environment. One form of renewable energy that is sustainable and has a cycle is water. The calculation in this plan aims to determine the potential of water flow in the Sei Gong Dam as one of the renewable energy sources through the Micro Hydro Power Plant. Calculations in this plan consist of hydrological analysis calculations, reliable discharge analysis, calculation of electric power that can be produced, and selection of suitable turbine types. Hydrological analysis calculations using climatology data from climate stations. Whereas the calculation of the mainstay flow requires the Sei Gong Dam data. The results of the calculation in this plan get the results of a maximum rainfall of 100 years is 442.163 mm, the flood discharge plan for 100 years is 441.984 m3 / second, and the calculation of the main discharge is 0.11 m3 / second. With such hydrological results, the electrical power that can be produced is 3.24 kW. So it can be concluded that the Sei Gong Dam has the potential to be a PLTMH but with the small electric power generated. With a 6 meter high water fall, the type of turbine used is the Kaplan& Propeller type turbine.
Item Type: | Thesis (Undergraduate) |
---|---|
Additional Information: | Similarity: 22 |
Uncontrolled Keywords: | Micro Hydro Power, Hydrology, Renewable Energy |
Subjects: | T Technology > TC Hydraulic engineering. Ocean engineering |
Divisions: | School of Civil Engineering and Planning > Civil Engineering |
SWORD Depositor: | Admin Repository Universitas Internasional Batam |
Depositing User: | Admin Repository Universitas Internasional Batam |
Date Deposited: | 28 Apr 2020 04:52 |
Last Modified: | 28 Apr 2020 07:02 |