Purwanto, Eko (2019) Analisis Perbandingan Biaya dan Waktu Pada Pekerjaan Beton Drainase Jalan Raya Menggunakan Metode Sistem Cast In Situ dan Sistem Precast (Studi Kasus : Proyek Penataan Jalan Baloi Center dan Jalan Raden Patah Kota Batam). Undergraduate thesis, Universitas Internasional Batam.
|
Text
s-1511054-abstract-en.pdf Download (176kB) | Preview |
|
|
Text
s-1511054-abstract-id.pdf Download (274kB) | Preview |
|
|
Text
s-1511054-bibliography.pdf Download (268kB) | Preview |
|
|
Text
s-1511054-chapter1.pdf Download (629kB) | Preview |
|
|
Text
s-1511054-chapter2.pdf Download (1MB) | Preview |
|
|
Text
s-1511054-chapter5.pdf Download (292kB) | Preview |
|
|
Text
s-1511054-cover-id.pdf Download (26kB) | Preview |
Abstract
Proyek konstruksi merupakan kegiatan proyek pembangunan yang dikerjakan dalam waktu yang terbatas dan biaya yang efisien. Pekerjaan dalam waktu yang terbatas membutuhkan suatu metode kerja yang efektif dalam pekerjaan konstruksi. Perbandingan metode pekerjaan saluran ini dilakukan diproyek penataan jalan raya wilayah 3 Batam Kota bertepatan di lokasi jalan simpang baloi – simpang kampung nelayan dan jalan raden patah. Dari hasil analisis pekerjaan drainase ini didapatkan beberapa kesimpulan 2 buah metode kerja yaitu metode cast insitu/konvensional dan metode precast/pracetak. Dari kedua metode tersebut didapat hasil perbandingan biaya dan harga dalam pekerjaan drainase cor di tempat dan drainase precast yaitu biaya pekerjaan cor di tempat adalah Rp. 352,404,140.06 dan biaya pekerjaan precast adalah Rp. 344,977,667.24. Dari kedua metode kerja tersebut mendapatkan selisih Rp. 7,426,472.76 dan dari segi waktu metode cast in situ menghabiskan waktu 40 hari kerja sedangkan precast menghabiskan waktu 22 hari kerja. Dari segi biaya metode konvensional lebih efisien sedangkan dari segi waktu metode precast lebih efisien. ********************************************************************** The construction project is a development project activity that is carried out in a limited time and cost-efficient. Work in limited time requires an effective work method in construction work. Comparison of the method of the work of this channel is carried out on the highway 3 region arrangement project Batam City coincided at the location of the Baloi intersection - the intersection of the fishing village and the broken Raden road. From the results of the analysis of the drainage works, it was concluded that there were 2 working methods, namely in situ cast method / conventional method and precast / precast method. From the two methods, the results of the comparison of costs and prices in the cast drainage work in place and precast drainage ie the cost of the cast work in place is Rp. 352,404,140.06 and the cost of the precast work is Rp. 344,977,667.24. From the two methods of work get a difference of Rp. 7,426,472.76 and in terms of time the cast in situ method takes 40 working days while precast takes 22 working days. In terms of cost the conventional method is more efficient while in terms of time the precast method is more efficient.
Item Type: | Thesis (Undergraduate) |
---|---|
Additional Information: | Similarity: 20 |
Uncontrolled Keywords: | drainage, cost comparison, time comparison, precast, cast Insitu, concrete, SNI |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) T Technology > TC Hydraulic engineering. Ocean engineering |
Divisions: | School of Civil Engineering and Planning > Civil Engineering |
SWORD Depositor: | Admin Repository Universitas Internasional Batam |
Depositing User: | Admin Repository Universitas Internasional Batam |
Date Deposited: | 17 Oct 2019 08:27 |
Last Modified: | 17 Oct 2019 08:27 |
URI: | http://repository.uib.ac.id/id/eprint/1543 |
Actions (login required)
View Item |