Metodologi Sheet Pile Proyek Pembangunan Slipway PT. Pratama Widya

Widdyanto, Singgih Pangestu (2018) Metodologi Sheet Pile Proyek Pembangunan Slipway PT. Pratama Widya. Project Report. UNSPECIFIED. (Submitted)

[img]
Preview
Text
k-1511020-abstract-en.pdf

Download (967kB) | Preview
[img]
Preview
Text
k-1511020-abstract-id.pdf

Download (992kB) | Preview
[img] Text
k-1511020-bibliography.pdf

Download (286B)
[img]
Preview
Text
k-1511020-chapter1.pdf

Download (2MB) | Preview
[img]
Preview
Text
k-1511020-chapter2.pdf

Download (6MB) | Preview
[img]
Preview
Text
k-1511020-chapter3.pdf

Download (4MB) | Preview
[img]
Preview
Text
k-1511020-chapter4.pdf

Download (8MB) | Preview
[img] Text
k-1511020-chapter5.pdf
Restricted to Repository staff only

Download (6MB) | Request a copy
[img] Text
k-1511020-chapter6.pdf
Restricted to Repository staff only

Download (1MB) | Request a copy
[img] Text
k-1511020-chapter7.pdf

Download (282B)
[img]
Preview
Text
k-1511020-cover-id.pdf

Download (34kB) | Preview

Abstract

Kerja praktek ini bertujuan untuk mengetahui metode pelaksanaan konstruksi pada Proyek Pembangunan Slipway PT Karimun Anugrah Sejati serta menganalisis struktur kolom yang sedang dikerjakan. Kerja praktek dilakukan selama 3 bulan lamanya dari bulan Maret 2018 sampai dengan bulan Juni 2018 dengan cara observasi langsung kelapangan tempat berlangsungnya pekerjaan konstruksi. Kerja praktek ini memberikan manfaat kepada penulis berupa pengalaman kerja nyata serta mengenal sistem dan metode pelaksanaan yang dilakukan pada proyek.hal-hal yang dipelajari berupa tata cara pelaksanaan pekerjaan, langkah-langkah dalam membangun suatu konstruksi, sehingga pengontrolan yang dilakukan selama proses pembangunan berlangsung. Hasil metodologi terhadap sheet pile yang dilakukan penulis berdasarkan pekerjaan dilapangan alat kerja yang digunakan sudah sangat cukup memadai. ********************************************************************** This practical work aims to determine the method of construction implementation at the PT Karimun Anugrah Sejati Slipway Construction Project and analyze the structure of the column being worked on. Practical work is carried out for 3 months from March 2018 to June 2018 by direct observation of the location of the construction work. This practical work provides benefits to the author in the form of real work experience and recognizes the system and method of implementation carried out on the project. The things learned are in the form of work procedures, steps in building a construction, so that control is carried out during the development process. The methodology results for sheet pile by the author based on the work in the field of work tools used are very sufficient.

Item Type: Monograph (Project Report)
Additional Information: Similarity: 19
Uncontrolled Keywords: methodology, tools.
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
T Technology > TH Building construction
Divisions: School of Civil Engineering and Planning > Civil Engineering
SWORD Depositor: Admin Repository Universitas Internasional Batam
Depositing User: Admin Repository Universitas Internasional Batam
Date Deposited: 29 Apr 2020 08:17
Last Modified: 29 Apr 2020 08:18
URI: http://repository.uib.ac.id/id/eprint/2523

Actions (login required)

View Item View Item